Weekly test rotation for 60 call points
With 60 call points, one a week takes 60 weeks to reach every call point, so 8 of them are not operated by the weekly test within a year. Testing 2 a week, from different zones on different weeks where you can, reaches all of them in 30 weeks. The service visits test every device as well. Put your own start date and number of call points into the planner and print the page as your log sheet.
Next service due 15 Dec 2026.
Any date from 15 Nov 2026 to 15 Jan 2027 is inside the 5 to 7 month window that BS 5839-1:2025 allows after the visit on 15 Jun 2026.
Service visits for the next two years
| Visit | Earliest | Due | Latest | Also at this visit |
|---|---|---|---|---|
| 1 | 15 Nov 2026 | 15 Dec 2026 | 15 Jan 2027 | ARC signals, panel clock, false alarm rate |
| 2 | 15 May 2027 | 15 Jun 2027 | 15 Jul 2027 | 12 months on: duct smoke detectors |
| 3 | 15 Nov 2027 | 15 Dec 2027 | 15 Jan 2028 | ARC signals, panel clock, false alarm rate |
| 4 | 15 May 2028 | 15 Jun 2028 | 15 Jul 2028 | 12 months on: duct smoke detectors |
Assumes each visit happens on its due date. If your last visit was not a 12-monthly one, the 12-monthly items fall on visits 1 and 3 instead. Every visit checks ARC signals, the panel clock and the false alarm rate.
Weekly call point rotation
With 60 call points, one a week takes 60 weeks to reach every call point, so 8 of them are not operated by the weekly test within a year. Testing 2 a week, from different zones on different weeks where you can, reaches all of them in 30 weeks. The service visits test every device as well.
| Week | Date | Call point | Result | Signature |
|---|---|---|---|---|
| 1 | Mon 23 Nov 2026 | CP 1 | ||
| 2 | Mon 30 Nov 2026 | CP 2 | ||
| 3 | Mon 7 Dec 2026 | CP 3 | ||
| 4 | Mon 14 Dec 2026 | CP 4 | ||
| 5 | Mon 21 Dec 2026 | CP 5 | ||
| 6 | Mon 28 Dec 2026 | CP 6 | ||
| 7 | Mon 4 Jan 2027 | CP 7 | ||
| 8 | Mon 11 Jan 2027 | CP 8 | ||
| 9 | Mon 18 Jan 2027 | CP 9 | ||
| 10 | Mon 25 Jan 2027 | CP 10 | ||
| 11 | Mon 1 Feb 2027 | CP 11 | ||
| 12 | Mon 8 Feb 2027 | CP 12 | ||
| 13 | Mon 15 Feb 2027 | CP 13 | ||
| 14 | Mon 22 Feb 2027 | CP 14 | ||
| 15 | Mon 1 Mar 2027 | CP 15 | ||
| 16 | Mon 8 Mar 2027 | CP 16 | ||
| 17 | Mon 15 Mar 2027 | CP 17 | ||
| 18 | Mon 22 Mar 2027 | CP 18 | ||
| 19 | Mon 29 Mar 2027 | CP 19 | ||
| 20 | Mon 5 Apr 2027 | CP 20 | ||
| 21 | Mon 12 Apr 2027 | CP 21 | ||
| 22 | Mon 19 Apr 2027 | CP 22 | ||
| 23 | Mon 26 Apr 2027 | CP 23 | ||
| 24 | Mon 3 May 2027 | CP 24 | ||
| 25 | Mon 10 May 2027 | CP 25 | ||
| 26 | Mon 17 May 2027 | CP 26 | ||
| 27 | Mon 24 May 2027 | CP 27 | ||
| 28 | Mon 31 May 2027 | CP 28 | ||
| 29 | Mon 7 Jun 2027 | CP 29 | ||
| 30 | Mon 14 Jun 2027 | CP 30 | ||
| 31 | Mon 21 Jun 2027 | CP 31 | ||
| 32 | Mon 28 Jun 2027 | CP 32 | ||
| 33 | Mon 5 Jul 2027 | CP 33 | ||
| 34 | Mon 12 Jul 2027 | CP 34 | ||
| 35 | Mon 19 Jul 2027 | CP 35 | ||
| 36 | Mon 26 Jul 2027 | CP 36 | ||
| 37 | Mon 2 Aug 2027 | CP 37 | ||
| 38 | Mon 9 Aug 2027 | CP 38 | ||
| 39 | Mon 16 Aug 2027 | CP 39 | ||
| 40 | Mon 23 Aug 2027 | CP 40 | ||
| 41 | Mon 30 Aug 2027 | CP 41 | ||
| 42 | Mon 6 Sep 2027 | CP 42 | ||
| 43 | Mon 13 Sep 2027 | CP 43 | ||
| 44 | Mon 20 Sep 2027 | CP 44 | ||
| 45 | Mon 27 Sep 2027 | CP 45 | ||
| 46 | Mon 4 Oct 2027 | CP 46 | ||
| 47 | Mon 11 Oct 2027 | CP 47 | ||
| 48 | Mon 18 Oct 2027 | CP 48 | ||
| 49 | Mon 25 Oct 2027 | CP 49 | ||
| 50 | Mon 1 Nov 2027 | CP 50 | ||
| 51 | Mon 8 Nov 2027 | CP 51 | ||
| 52 | Mon 15 Nov 2027 | CP 52 |
Showing the first 52 weeks. The rotation continues with CP 53.
False alarm rate
1 / 40 x 100 = 2.5 false alarms per 100 detectors per year. Under 4 per 100. The servicing engineer still checks the rate at every visit.
Runs in your browser; nothing you type is sent anywhere. England and Wales.
Rotation from Monday 23 Nov 2026
| Week | Date | Call point | Result | Signature |
|---|---|---|---|---|
| 1 | Mon 23 Nov 2026 | CP 1 | ||
| 2 | Mon 30 Nov 2026 | CP 2 | ||
| 3 | Mon 7 Dec 2026 | CP 3 | ||
| 4 | Mon 14 Dec 2026 | CP 4 | ||
| 5 | Mon 21 Dec 2026 | CP 5 | ||
| 6 | Mon 28 Dec 2026 | CP 6 | ||
| 7 | Mon 4 Jan 2027 | CP 7 | ||
| 8 | Mon 11 Jan 2027 | CP 8 | ||
| 9 | Mon 18 Jan 2027 | CP 9 | ||
| 10 | Mon 25 Jan 2027 | CP 10 | ||
| 11 | Mon 1 Feb 2027 | CP 11 | ||
| 12 | Mon 8 Feb 2027 | CP 12 | ||
| 13 | Mon 15 Feb 2027 | CP 13 | ||
| 14 | Mon 22 Feb 2027 | CP 14 | ||
| 15 | Mon 1 Mar 2027 | CP 15 | ||
| 16 | Mon 8 Mar 2027 | CP 16 | ||
| 17 | Mon 15 Mar 2027 | CP 17 | ||
| 18 | Mon 22 Mar 2027 | CP 18 | ||
| 19 | Mon 29 Mar 2027 | CP 19 | ||
| 20 | Mon 5 Apr 2027 | CP 20 | ||
| 21 | Mon 12 Apr 2027 | CP 21 | ||
| 22 | Mon 19 Apr 2027 | CP 22 | ||
| 23 | Mon 26 Apr 2027 | CP 23 | ||
| 24 | Mon 3 May 2027 | CP 24 | ||
| 25 | Mon 10 May 2027 | CP 25 | ||
| 26 | Mon 17 May 2027 | CP 26 | ||
| 27 | Mon 24 May 2027 | CP 27 | ||
| 28 | Mon 31 May 2027 | CP 28 | ||
| 29 | Mon 7 Jun 2027 | CP 29 | ||
| 30 | Mon 14 Jun 2027 | CP 30 | ||
| 31 | Mon 21 Jun 2027 | CP 31 | ||
| 32 | Mon 28 Jun 2027 | CP 32 | ||
| 33 | Mon 5 Jul 2027 | CP 33 | ||
| 34 | Mon 12 Jul 2027 | CP 34 | ||
| 35 | Mon 19 Jul 2027 | CP 35 | ||
| 36 | Mon 26 Jul 2027 | CP 36 | ||
| 37 | Mon 2 Aug 2027 | CP 37 | ||
| 38 | Mon 9 Aug 2027 | CP 38 | ||
| 39 | Mon 16 Aug 2027 | CP 39 | ||
| 40 | Mon 23 Aug 2027 | CP 40 | ||
| 41 | Mon 30 Aug 2027 | CP 41 | ||
| 42 | Mon 6 Sep 2027 | CP 42 | ||
| 43 | Mon 13 Sep 2027 | CP 43 | ||
| 44 | Mon 20 Sep 2027 | CP 44 | ||
| 45 | Mon 27 Sep 2027 | CP 45 | ||
| 46 | Mon 4 Oct 2027 | CP 46 | ||
| 47 | Mon 11 Oct 2027 | CP 47 | ||
| 48 | Mon 18 Oct 2027 | CP 48 | ||
| 49 | Mon 25 Oct 2027 | CP 49 | ||
| 50 | Mon 1 Nov 2027 | CP 50 | ||
| 51 | Mon 8 Nov 2027 | CP 51 | ||
| 52 | Mon 15 Nov 2027 | CP 52 |
The table stops at week 52. At 2 call points a week, the whole cycle takes 30 weeks.
Sources: South Wales Fire and Rescue Service log book, FireRegsPro. BS 5839-1 is sold by BSI and we have not reproduced it; the wording here is ours.
Before you rely on these dates
- The rules here come from published summaries of BS 5839-1:2025 by the Fire Industry Association and the IET, and from fire and rescue service log book guidance, each linked on the page it is used. The standard itself is sold by BSI, so the wording on this site is ours.
- The planner works out dates, a rotation and a rate. It does not certify a system or replace a fire risk assessment.
- Your servicing company decides what each visit covers and issues the certificate. If their schedule differs, theirs is the one to follow.
- England and Wales. Scotland and Northern Ireland have their own fire safety law.
Questions
Is the weekly test the only time a call point is tested?
No. Over the year the service visits test every detector, call point and sounder at least once as well.