Fire Alarm RegisterAll guides

The weekly fire alarm test

BS 5839-1 puts the weekly test with the user of the building: the responsible person or someone they delegate it to. It proves the panel, the wiring to that call point and the sounders still work.

The date on the last servicing certificate, or the date a new system was accepted.
Every break glass point on the system.
The day the rotation starts. Same weekday each week.
Smoke, heat and multi-sensor heads. 0 for a manual system.
From the log book.

Next service due 15 Dec 2026.

Any date from 15 Nov 2026 to 15 Jan 2027 is inside the 5 to 7 month window that BS 5839-1:2025 allows after the visit on 15 Jun 2026.

Service visits for the next two years

VisitEarliestDueLatestAlso at this visit
115 Nov 202615 Dec 202615 Jan 2027ARC signals, panel clock, false alarm rate
215 May 202715 Jun 202715 Jul 202712 months on: duct smoke detectors
315 Nov 202715 Dec 202715 Jan 2028ARC signals, panel clock, false alarm rate
415 May 202815 Jun 202815 Jul 202812 months on: duct smoke detectors

Assumes each visit happens on its due date. If your last visit was not a 12-monthly one, the 12-monthly items fall on visits 1 and 3 instead. Every visit checks ARC signals, the panel clock and the false alarm rate.

Weekly call point rotation

With 8 call points, each one is operated once every 8 weeks, so about 6.5 times a year by the weekly test alone.

WeekDateCall pointResultSignature
1Mon 23 Nov 2026CP 1
2Mon 30 Nov 2026CP 2
3Mon 7 Dec 2026CP 3
4Mon 14 Dec 2026CP 4
5Mon 21 Dec 2026CP 5
6Mon 28 Dec 2026CP 6
7Mon 4 Jan 2027CP 7
8Mon 11 Jan 2027CP 8

False alarm rate

1 / 40 x 100 = 2.5 false alarms per 100 detectors per year. Under 4 per 100. The servicing engineer still checks the rate at every visit.

Runs in your browser; nothing you type is sent anywhere. England and Wales.

Steps

  1. Operate one manual call point with its test key, during normal working hours.
  2. Check that the panel shows the alarm and that the alarm sounds.
  3. Reset the call point and the panel.
  4. Write the date, the zone, the call point used, the result and any fault in the log book, and sign it.
  5. Next week, use the next call point. Choose them on a strict rotation so every one gets used.

If the system sends signals to an alarm receiving centre, agree with the centre how test alarms are handled before you start.

The rotation for 8 call points starting on Monday 23 Nov 2026:

WeekDateCall pointResultSignature
1Mon 23 Nov 2026CP 1
2Mon 30 Nov 2026CP 2
3Mon 7 Dec 2026CP 3
4Mon 14 Dec 2026CP 4
5Mon 21 Dec 2026CP 5
6Mon 28 Dec 2026CP 6
7Mon 4 Jan 2027CP 7
8Mon 11 Jan 2027CP 8

Sources: South Wales Fire and Rescue Service log book, FireRegsPro, Hawthorne Systems. BS 5839-1 is sold by BSI and we have not reproduced it; the wording here is ours.

Who can do it, and what a contractor costs

The responsible person, or anyone they delegate it to. A contractor can do it too; one firm puts a weekly test visit at £45 to £90, which over 52 weeks costs far more than a few minutes of someone on site.

Before you rely on these dates

Questions

Does the weekly test need an engineer?

No. BS 5839-1 places the weekly test with the user of the building. The six-monthly service is the engineer's job.

What if a call point fails?

Record the fault and the action taken in the log book and call the servicing company. Their name and number should be displayed at the main control panel.

Related

A service register for every site you look after

We are building a register for fire alarm engineers and building managers: every site's service dates and windows, weekly test rotations and false alarm rates in one place, with a reminder before a visit falls outside its window. Planned price £39 a month. Join the waitlist and we will email you when it opens. Nothing to pay now.