Fire alarm system categories
The category on the design certificate says what the system is for and where detection is fitted. Every category gets the weekly test and the six-monthly service.
Next service due 15 Dec 2026.
Any date from 15 Nov 2026 to 15 Jan 2027 is inside the 5 to 7 month window that BS 5839-1:2025 allows after the visit on 15 Jun 2026.
Service visits for the next two years
| Visit | Earliest | Due | Latest | Also at this visit |
|---|---|---|---|---|
| 1 | 15 Nov 2026 | 15 Dec 2026 | 15 Jan 2027 | ARC signals, panel clock, false alarm rate |
| 2 | 15 May 2027 | 15 Jun 2027 | 15 Jul 2027 | 12 months on: duct smoke detectors |
| 3 | 15 Nov 2027 | 15 Dec 2027 | 15 Jan 2028 | ARC signals, panel clock, false alarm rate |
| 4 | 15 May 2028 | 15 Jun 2028 | 15 Jul 2028 | 12 months on: duct smoke detectors |
Assumes each visit happens on its due date. If your last visit was not a 12-monthly one, the 12-monthly items fall on visits 1 and 3 instead. Every visit checks ARC signals, the panel clock and the false alarm rate.
Weekly call point rotation
With 12 call points, each one is operated once every 12 weeks, so about 4.3 times a year by the weekly test alone.
| Week | Date | Call point | Result | Signature |
|---|---|---|---|---|
| 1 | Mon 23 Nov 2026 | CP 1 | ||
| 2 | Mon 30 Nov 2026 | CP 2 | ||
| 3 | Mon 7 Dec 2026 | CP 3 | ||
| 4 | Mon 14 Dec 2026 | CP 4 | ||
| 5 | Mon 21 Dec 2026 | CP 5 | ||
| 6 | Mon 28 Dec 2026 | CP 6 | ||
| 7 | Mon 4 Jan 2027 | CP 7 | ||
| 8 | Mon 11 Jan 2027 | CP 8 | ||
| 9 | Mon 18 Jan 2027 | CP 9 | ||
| 10 | Mon 25 Jan 2027 | CP 10 | ||
| 11 | Mon 1 Feb 2027 | CP 11 | ||
| 12 | Mon 8 Feb 2027 | CP 12 |
False alarm rate
No automatic detectors entered, so there is no rate per 100 detectors to work out.
Runs in your browser; nothing you type is sent anywhere. England and Wales.
The eight categories
| M | Manual: call points and sounders, no automatic detectors. |
|---|---|
| L1 | Installed throughout all areas of the building, for life safety. |
| L2 | Everything an L3 system covers, plus more areas such as those of high risk. |
| L3 | Detection so everyone except possibly those in the room where the fire starts can escape. |
| L4 | Detection in escape route circulation areas, such as corridors and stairways. |
| L5 | Designed for one specific fire safety objective. |
| P1 | Installed throughout all areas of the building, for property protection. |
| P2 | Installed only in defined parts of the building. |
Sources: FIA guide to system categories (2012). BS 5839-1 is sold by BSI and we have not reproduced it; the wording here is ours.
Before you rely on these dates
- The rules here come from published summaries of BS 5839-1:2025 by the Fire Industry Association and the IET, and from fire and rescue service log book guidance, each linked on the page it is used. The standard itself is sold by BSI, so the wording on this site is ours.
- The planner works out dates, a rotation and a rate. It does not certify a system or replace a fire risk assessment.
- Your servicing company decides what each visit covers and issues the certificate. If their schedule differs, theirs is the one to follow.
- England and Wales. Scotland and Northern Ireland have their own fire safety law.
Questions
Does a category M system need servicing?
Yes. A manual system still has call points, a panel and sounders to test and service. It has no false alarm rate per 100 detectors, because it has no detectors.