BS 5839-1 fire alarm certificates
Each stage of a fire alarm system has a model certificate. The inspection and servicing certificate is the one a building sees after every service visit.
Next service due 1 Mar 2027.
Any date from 1 Feb 2027 to 1 Apr 2027 is inside the 5 to 7 month window that BS 5839-1:2025 allows after the visit on 1 Sep 2026.
Service visits for the next two years
| Visit | Earliest | Due | Latest | Also at this visit |
|---|---|---|---|---|
| 1 | 1 Feb 2027 | 1 Mar 2027 | 1 Apr 2027 | ARC signals, panel clock, false alarm rate |
| 2 | 1 Aug 2027 | 1 Sep 2027 | 1 Oct 2027 | 12 months on: duct smoke detectors |
| 3 | 1 Feb 2028 | 1 Mar 2028 | 1 Apr 2028 | ARC signals, panel clock, false alarm rate |
| 4 | 1 Aug 2028 | 1 Sep 2028 | 1 Oct 2028 | 12 months on: duct smoke detectors |
Assumes each visit happens on its due date. If your last visit was not a 12-monthly one, the 12-monthly items fall on visits 1 and 3 instead. Every visit checks ARC signals, the panel clock and the false alarm rate.
Weekly call point rotation
With 12 call points, each one is operated once every 12 weeks, so about 4.3 times a year by the weekly test alone.
| Week | Date | Call point | Result | Signature |
|---|---|---|---|---|
| 1 | Mon 23 Nov 2026 | CP 1 | ||
| 2 | Mon 30 Nov 2026 | CP 2 | ||
| 3 | Mon 7 Dec 2026 | CP 3 | ||
| 4 | Mon 14 Dec 2026 | CP 4 | ||
| 5 | Mon 21 Dec 2026 | CP 5 | ||
| 6 | Mon 28 Dec 2026 | CP 6 | ||
| 7 | Mon 4 Jan 2027 | CP 7 | ||
| 8 | Mon 11 Jan 2027 | CP 8 | ||
| 9 | Mon 18 Jan 2027 | CP 9 | ||
| 10 | Mon 25 Jan 2027 | CP 10 | ||
| 11 | Mon 1 Feb 2027 | CP 11 | ||
| 12 | Mon 8 Feb 2027 | CP 12 |
False alarm rate
1 / 40 x 100 = 2.5 false alarms per 100 detectors per year. Under 4 per 100. The servicing engineer still checks the rate at every visit.
Runs in your browser; nothing you type is sent anywhere. England and Wales.
The certificates
| Reference | Certificate | When |
|---|---|---|
| G1 | Design | Before installation |
| G2 | Installation | When the wiring and devices are in |
| G3 | Commissioning | When the system has been tested and works |
| G4 | Acceptance | When the user accepts it; the starting date for service periods |
| G5 | Verification | In place of design, installation and commissioning |
| G6 | Inspection and servicing | After every service visit |
| G7 | Modification; extension or modification from 2025 | After changes, including a panel firmware update |
At the service the engineer records every defect and every departure from the standard, then issues the inspection and servicing certificate.
The G references come from FIA guidance written for an earlier edition, and the FIA notes certificates may not carry them. In the 2025 edition the model certificates are in Annex G.
Sources: FIA guidance on certificates, IET Wiring Matters, November 2025, FIA guide to the 2025 changes, Hawthorne Systems. BS 5839-1 is sold by BSI and we have not reproduced it; the wording here is ours.
Before you rely on these dates
- The rules here come from published summaries of BS 5839-1:2025 by the Fire Industry Association and the IET, and from fire and rescue service log book guidance, each linked on the page it is used. The standard itself is sold by BSI, so the wording on this site is ours.
- The planner works out dates, a rotation and a rate. It does not certify a system or replace a fire risk assessment.
- Your servicing company decides what each visit covers and issues the certificate. If their schedule differs, theirs is the one to follow.
- England and Wales. Scotland and Northern Ireland have their own fire safety law.
Questions
Who issues the servicing certificate?
The competent person who services the system, after each visit.