Fire alarm maintenance and the law
In England and Wales the responsible person must make sure fire safety equipment is subject to a suitable system of maintenance and kept in an efficient state, in efficient working order and in good repair (article 17). The Order does not set intervals; BS 5839-1 is the usual measure.
Next service due 30 Oct 2026.
Any date from 30 Sep 2026 to 30 Nov 2026 is inside the 5 to 7 month window that BS 5839-1:2025 allows after the visit on 30 Apr 2026.
Service visits for the next two years
| Visit | Earliest | Due | Latest | Also at this visit |
|---|---|---|---|---|
| 1 | 30 Sep 2026 | 30 Oct 2026 | 30 Nov 2026 | ARC signals, panel clock, false alarm rate |
| 2 | 30 Mar 2027 | 30 Apr 2027 | 30 May 2027 | 12 months on: duct smoke detectors |
| 3 | 30 Sep 2027 | 30 Oct 2027 | 30 Nov 2027 | ARC signals, panel clock, false alarm rate |
| 4 | 30 Mar 2028 | 30 Apr 2028 | 30 May 2028 | 12 months on: duct smoke detectors |
Assumes each visit happens on its due date. If your last visit was not a 12-monthly one, the 12-monthly items fall on visits 1 and 3 instead. Every visit checks ARC signals, the panel clock and the false alarm rate.
Weekly call point rotation
With 12 call points, each one is operated once every 12 weeks, so about 4.3 times a year by the weekly test alone.
| Week | Date | Call point | Result | Signature |
|---|---|---|---|---|
| 1 | Mon 23 Nov 2026 | CP 1 | ||
| 2 | Mon 30 Nov 2026 | CP 2 | ||
| 3 | Mon 7 Dec 2026 | CP 3 | ||
| 4 | Mon 14 Dec 2026 | CP 4 | ||
| 5 | Mon 21 Dec 2026 | CP 5 | ||
| 6 | Mon 28 Dec 2026 | CP 6 | ||
| 7 | Mon 4 Jan 2027 | CP 7 | ||
| 8 | Mon 11 Jan 2027 | CP 8 | ||
| 9 | Mon 18 Jan 2027 | CP 9 | ||
| 10 | Mon 25 Jan 2027 | CP 10 | ||
| 11 | Mon 1 Feb 2027 | CP 11 | ||
| 12 | Mon 8 Feb 2027 | CP 12 |
False alarm rate
1 / 40 x 100 = 2.5 false alarms per 100 detectors per year. Under 4 per 100. The servicing engineer still checks the rate at every visit.
Runs in your browser; nothing you type is sent anywhere. England and Wales.
What a fire risk assessment checks
The government's fire risk assessment checklist asks whether weekly testing and periodic maintenance routines are in place for the fire alarm, and whether records are kept. A service schedule for a visit on 30 Apr 2026:
| After 30 Apr 2026 | Earliest | Due | Latest |
|---|---|---|---|
| Visit 1 | 30 Sep 2026 | 30 Oct 2026 | 30 Nov 2026 |
| Visit 2 | 30 Mar 2027 | 30 Apr 2027 | 30 May 2027 |
Scotland and Northern Ireland
Different legislation applies there. This site covers England and Wales.
Before you rely on these dates
- The rules here come from published summaries of BS 5839-1:2025 by the Fire Industry Association and the IET, and from fire and rescue service log book guidance, each linked on the page it is used. The standard itself is sold by BSI, so the wording on this site is ours.
- The planner works out dates, a rotation and a rate. It does not certify a system or replace a fire risk assessment.
- Your servicing company decides what each visit covers and issues the certificate. If their schedule differs, theirs is the one to follow.
- England and Wales. Scotland and Northern Ireland have their own fire safety law.
Questions
Can the responsible person hand the testing to someone else?
They can delegate tasks like the weekly test, but the duty stays theirs.