When a fire alarm service is missed
A visit up to 7 months after the last one is inside the 2025 allowance. Past that, book the service, note why it was late in the log book, and bring later dates back towards the original schedule.
Next service due 10 Aug 2026.
Any date from 10 Jul 2026 to 10 Sep 2026 is inside the 5 to 7 month window that BS 5839-1:2025 allows after the visit on 10 Feb 2026.
Service visits for the next two years
| Visit | Earliest | Due | Latest | Also at this visit |
|---|---|---|---|---|
| 1 | 10 Jul 2026 | 10 Aug 2026 | 10 Sep 2026 | ARC signals, panel clock, false alarm rate |
| 2 | 10 Jan 2027 | 10 Feb 2027 | 10 Mar 2027 | 12 months on: duct smoke detectors |
| 3 | 10 Jul 2027 | 10 Aug 2027 | 10 Sep 2027 | ARC signals, panel clock, false alarm rate |
| 4 | 10 Jan 2028 | 10 Feb 2028 | 10 Mar 2028 | 12 months on: duct smoke detectors |
Assumes each visit happens on its due date. If your last visit was not a 12-monthly one, the 12-monthly items fall on visits 1 and 3 instead. Every visit checks ARC signals, the panel clock and the false alarm rate.
Weekly call point rotation
With 12 call points, each one is operated once every 12 weeks, so about 4.3 times a year by the weekly test alone.
| Week | Date | Call point | Result | Signature |
|---|---|---|---|---|
| 1 | Mon 23 Nov 2026 | CP 1 | ||
| 2 | Mon 30 Nov 2026 | CP 2 | ||
| 3 | Mon 7 Dec 2026 | CP 3 | ||
| 4 | Mon 14 Dec 2026 | CP 4 | ||
| 5 | Mon 21 Dec 2026 | CP 5 | ||
| 6 | Mon 28 Dec 2026 | CP 6 | ||
| 7 | Mon 4 Jan 2027 | CP 7 | ||
| 8 | Mon 11 Jan 2027 | CP 8 | ||
| 9 | Mon 18 Jan 2027 | CP 9 | ||
| 10 | Mon 25 Jan 2027 | CP 10 | ||
| 11 | Mon 1 Feb 2027 | CP 11 | ||
| 12 | Mon 8 Feb 2027 | CP 12 |
False alarm rate
1 / 40 x 100 = 2.5 false alarms per 100 detectors per year. Under 4 per 100. The servicing engineer still checks the rate at every visit.
Runs in your browser; nothing you type is sent anywhere. England and Wales.
Example
Last service 10 Feb 2026. Due 10 Aug 2026, latest 10 Sep 2026. A visit after 10 Sep 2026 is outside the window.
| After 10 Feb 2026 | Earliest | Due | Latest |
|---|---|---|---|
| Visit 1 | 10 Jul 2026 | 10 Aug 2026 | 10 Sep 2026 |
| Visit 2 | 10 Jan 2027 | 10 Feb 2027 | 10 Mar 2027 |
Why it matters
The Regulatory Reform (Fire Safety) Order 2005 requires fire safety equipment to be subject to a suitable system of maintenance (article 17), and the government's fire risk assessment checklist asks whether weekly testing and periodic maintenance routines are in place and recorded. See the law.
Before you rely on these dates
- The rules here come from published summaries of BS 5839-1:2025 by the Fire Industry Association and the IET, and from fire and rescue service log book guidance, each linked on the page it is used. The standard itself is sold by BSI, so the wording on this site is ours.
- The planner works out dates, a rotation and a rate. It does not certify a system or replace a fire risk assessment.
- Your servicing company decides what each visit covers and issues the certificate. If their schedule differs, theirs is the one to follow.
- England and Wales. Scotland and Northern Ireland have their own fire safety law.
Questions
Is a late service illegal?
The law asks for a suitable system of maintenance; it does not name a number of months. BS 5839-1 is the usual measure of what is suitable.