The 12 month fire alarm service
Two visits a year, and one of them carries the 12 monthly checks. Across the year, every detector, call point and sounder should be tested at least once.
Next service due 20 Nov 2026.
Any date from 20 Oct 2026 to 20 Dec 2026 is inside the 5 to 7 month window that BS 5839-1:2025 allows after the visit on 20 May 2026.
Service visits for the next two years
| Visit | Earliest | Due | Latest | Also at this visit |
|---|---|---|---|---|
| 1 | 20 Oct 2026 | 20 Nov 2026 | 20 Dec 2026 | ARC signals, panel clock, false alarm rate |
| 2 | 20 Apr 2027 | 20 May 2027 | 20 Jun 2027 | 12 months on: duct smoke detectors |
| 3 | 20 Oct 2027 | 20 Nov 2027 | 20 Dec 2027 | ARC signals, panel clock, false alarm rate |
| 4 | 20 Apr 2028 | 20 May 2028 | 20 Jun 2028 | 12 months on: duct smoke detectors |
Assumes each visit happens on its due date. If your last visit was not a 12-monthly one, the 12-monthly items fall on visits 1 and 3 instead. Every visit checks ARC signals, the panel clock and the false alarm rate.
Weekly call point rotation
With 12 call points, each one is operated once every 12 weeks, so about 4.3 times a year by the weekly test alone.
| Week | Date | Call point | Result | Signature |
|---|---|---|---|---|
| 1 | Mon 23 Nov 2026 | CP 1 | ||
| 2 | Mon 30 Nov 2026 | CP 2 | ||
| 3 | Mon 7 Dec 2026 | CP 3 | ||
| 4 | Mon 14 Dec 2026 | CP 4 | ||
| 5 | Mon 21 Dec 2026 | CP 5 | ||
| 6 | Mon 28 Dec 2026 | CP 6 | ||
| 7 | Mon 4 Jan 2027 | CP 7 | ||
| 8 | Mon 11 Jan 2027 | CP 8 | ||
| 9 | Mon 18 Jan 2027 | CP 9 | ||
| 10 | Mon 25 Jan 2027 | CP 10 | ||
| 11 | Mon 1 Feb 2027 | CP 11 | ||
| 12 | Mon 8 Feb 2027 | CP 12 |
False alarm rate
1 / 40 x 100 = 2.5 false alarms per 100 detectors per year. Under 4 per 100. The servicing engineer still checks the rate at every visit.
Runs in your browser; nothing you type is sent anywhere. England and Wales.
At every visit under the 2025 edition
- Check the alarm signals sent to an alarm receiving centre, where the system has one.
- Check and adjust the panel's time clock.
- Check the false alarm rate.
- Review the log book, including the weekly tests and false alarms since the last visit.
Added at the 12 monthly visit
- Functional tests of smoke detectors in ventilation ducts.
- Zone plans verified over the 12 months.
Visits after 20 May 2026, with the 12 monthly checks on visits 2 and 4:
| After 20 May 2026 | Earliest | Due | Latest |
|---|---|---|---|
| Visit 1 | 20 Oct 2026 | 20 Nov 2026 | 20 Dec 2026 |
| Visit 2 | 20 Apr 2027 | 20 May 2027 | 20 Jun 2027 |
| Visit 3 | 20 Oct 2027 | 20 Nov 2027 | 20 Dec 2027 |
| Visit 4 | 20 Apr 2028 | 20 May 2028 | 20 Jun 2028 |
Sources: FIA guide to the changes in BS 5839-1:2025, IET Wiring Matters, November 2025, Hawthorne Systems. BS 5839-1 is sold by BSI and we have not reproduced it; the wording here is ours.
Before you rely on these dates
- The rules here come from published summaries of BS 5839-1:2025 by the Fire Industry Association and the IET, and from fire and rescue service log book guidance, each linked on the page it is used. The standard itself is sold by BSI, so the wording on this site is ours.
- The planner works out dates, a rotation and a rate. It does not certify a system or replace a fire risk assessment.
- Your servicing company decides what each visit covers and issues the certificate. If their schedule differs, theirs is the one to follow.
- England and Wales. Scotland and Northern Ireland have their own fire safety law.
Questions
Is every device tested at every visit?
Not necessarily. The tests are spread so that every detector, call point and sounder has been tested at least once over the year.