How often a fire alarm should be serviced
BS 5839-1:2025 recommends an inspection and service about every 6 months, and treats any visit from 5 to 7 months after the previous one as acceptable. The date the system was accepted is the starting point for these periods. The table gives the window after a visit on the 1st, the 15th and the last day of every month of 2026.
Next service due 30 Sep 2026.
Any date from 31 Aug 2026 to 31 Oct 2026 is inside the 5 to 7 month window that BS 5839-1:2025 allows after the visit on 31 Mar 2026.
Service visits for the next two years
| Visit | Earliest | Due | Latest | Also at this visit |
|---|---|---|---|---|
| 1 | 31 Aug 2026 | 30 Sep 2026 | 31 Oct 2026 | ARC signals, panel clock, false alarm rate |
| 2 | 28 Feb 2027 | 31 Mar 2027 | 30 Apr 2027 | 12 months on: duct smoke detectors |
| 3 | 31 Aug 2027 | 30 Sep 2027 | 31 Oct 2027 | ARC signals, panel clock, false alarm rate |
| 4 | 29 Feb 2028 | 31 Mar 2028 | 30 Apr 2028 | 12 months on: duct smoke detectors |
Assumes each visit happens on its due date. If your last visit was not a 12-monthly one, the 12-monthly items fall on visits 1 and 3 instead. Every visit checks ARC signals, the panel clock and the false alarm rate.
Weekly call point rotation
With 12 call points, each one is operated once every 12 weeks, so about 4.3 times a year by the weekly test alone.
| Week | Date | Call point | Result | Signature |
|---|---|---|---|---|
| 1 | Mon 23 Nov 2026 | CP 1 | ||
| 2 | Mon 30 Nov 2026 | CP 2 | ||
| 3 | Mon 7 Dec 2026 | CP 3 | ||
| 4 | Mon 14 Dec 2026 | CP 4 | ||
| 5 | Mon 21 Dec 2026 | CP 5 | ||
| 6 | Mon 28 Dec 2026 | CP 6 | ||
| 7 | Mon 4 Jan 2027 | CP 7 | ||
| 8 | Mon 11 Jan 2027 | CP 8 | ||
| 9 | Mon 18 Jan 2027 | CP 9 | ||
| 10 | Mon 25 Jan 2027 | CP 10 | ||
| 11 | Mon 1 Feb 2027 | CP 11 | ||
| 12 | Mon 8 Feb 2027 | CP 12 |
False alarm rate
1 / 40 x 100 = 2.5 false alarms per 100 detectors per year. Under 4 per 100. The servicing engineer still checks the rate at every visit.
Runs in your browser; nothing you type is sent anywhere. England and Wales.
The window for any visit date in 2026
| Last visit | Earliest next | Due | Latest next |
|---|---|---|---|
| 1 Jan 2026 | 1 Jun 2026 | 1 Jul 2026 | 1 Aug 2026 |
| 15 Jan 2026 | 15 Jun 2026 | 15 Jul 2026 | 15 Aug 2026 |
| 31 Jan 2026 | 30 Jun 2026 | 31 Jul 2026 | 31 Aug 2026 |
| 1 Feb 2026 | 1 Jul 2026 | 1 Aug 2026 | 1 Sep 2026 |
| 15 Feb 2026 | 15 Jul 2026 | 15 Aug 2026 | 15 Sep 2026 |
| 28 Feb 2026 | 28 Jul 2026 | 28 Aug 2026 | 28 Sep 2026 |
| 1 Mar 2026 | 1 Aug 2026 | 1 Sep 2026 | 1 Oct 2026 |
| 15 Mar 2026 | 15 Aug 2026 | 15 Sep 2026 | 15 Oct 2026 |
| 31 Mar 2026 | 31 Aug 2026 | 30 Sep 2026 | 31 Oct 2026 |
| 1 Apr 2026 | 1 Sep 2026 | 1 Oct 2026 | 1 Nov 2026 |
| 15 Apr 2026 | 15 Sep 2026 | 15 Oct 2026 | 15 Nov 2026 |
| 30 Apr 2026 | 30 Sep 2026 | 30 Oct 2026 | 30 Nov 2026 |
| 1 May 2026 | 1 Oct 2026 | 1 Nov 2026 | 1 Dec 2026 |
| 15 May 2026 | 15 Oct 2026 | 15 Nov 2026 | 15 Dec 2026 |
| 31 May 2026 | 31 Oct 2026 | 30 Nov 2026 | 31 Dec 2026 |
| 1 Jun 2026 | 1 Nov 2026 | 1 Dec 2026 | 1 Jan 2027 |
| 15 Jun 2026 | 15 Nov 2026 | 15 Dec 2026 | 15 Jan 2027 |
| 30 Jun 2026 | 30 Nov 2026 | 30 Dec 2026 | 30 Jan 2027 |
| 1 Jul 2026 | 1 Dec 2026 | 1 Jan 2027 | 1 Feb 2027 |
| 15 Jul 2026 | 15 Dec 2026 | 15 Jan 2027 | 15 Feb 2027 |
| 31 Jul 2026 | 31 Dec 2026 | 31 Jan 2027 | 28 Feb 2027 |
| 1 Aug 2026 | 1 Jan 2027 | 1 Feb 2027 | 1 Mar 2027 |
| 15 Aug 2026 | 15 Jan 2027 | 15 Feb 2027 | 15 Mar 2027 |
| 31 Aug 2026 | 31 Jan 2027 | 28 Feb 2027 | 31 Mar 2027 |
| 1 Sep 2026 | 1 Feb 2027 | 1 Mar 2027 | 1 Apr 2027 |
| 15 Sep 2026 | 15 Feb 2027 | 15 Mar 2027 | 15 Apr 2027 |
| 30 Sep 2026 | 28 Feb 2027 | 30 Mar 2027 | 30 Apr 2027 |
| 1 Oct 2026 | 1 Mar 2027 | 1 Apr 2027 | 1 May 2027 |
| 15 Oct 2026 | 15 Mar 2027 | 15 Apr 2027 | 15 May 2027 |
| 31 Oct 2026 | 31 Mar 2027 | 30 Apr 2027 | 31 May 2027 |
| 1 Nov 2026 | 1 Apr 2027 | 1 May 2027 | 1 Jun 2027 |
| 15 Nov 2026 | 15 Apr 2027 | 15 May 2027 | 15 Jun 2027 |
| 30 Nov 2026 | 30 Apr 2027 | 30 May 2027 | 30 Jun 2027 |
| 1 Dec 2026 | 1 May 2027 | 1 Jun 2027 | 1 Jul 2027 |
| 15 Dec 2026 | 15 May 2027 | 15 Jun 2027 | 15 Jul 2027 |
| 31 Dec 2026 | 31 May 2027 | 30 Jun 2027 | 31 Jul 2027 |
When the month six months on is shorter, the due date is its last day: 31 August plus 6 months is the end of February.
What changed in 2025
Under the 2017 edition, a gap of more than 6 months meant the system should be treated as no longer compliant with the standard. The 2025 edition keeps the 6 month interval but a visit from 5 to 7 months after the last is no longer non-compliant. See the 2025 changes.
Sources: FIA guide to the changes in BS 5839-1:2025, IET Wiring Matters, November 2025. BS 5839-1 is sold by BSI and we have not reproduced it; the wording here is ours.
Before you rely on these dates
- The rules here come from published summaries of BS 5839-1:2025 by the Fire Industry Association and the IET, and from fire and rescue service log book guidance, each linked on the page it is used. The standard itself is sold by BSI, so the wording on this site is ours.
- The planner works out dates, a rotation and a rate. It does not certify a system or replace a fire risk assessment.
- Your servicing company decides what each visit covers and issues the certificate. If their schedule differs, theirs is the one to follow.
- England and Wales. Scotland and Northern Ireland have their own fire safety law.
Questions
Does the window move if a visit is late?
The planner counts each window from the previous visit. The standard takes the date of acceptance as the starting point for the periods, so after a late visit it is sensible to bring later visits back towards the original dates.
Is an extra visit a problem?
No. The allowance is about how long a gap can be. An extra visit for a fault or a change is normal.